Client
![](https://su177.ru/wp-content/uploads/2019/05/0ee460f7b8eb567572c35d64b0cd0419.png)
Details
Scope of work: finishing and engineering works
Area: 550 m2
Address: Tyumen, Maligina street 4
2008
Completed Work
- Development of design documentation;
- General construction and finishing work;
- Electrical works;
- Installation of heating, plumbing and sanitation;
- Installation of ventilation and air conditioning;
- Equipment and installation of automatic fire alarm and fire warning systems;
- Structured cabling systems (computer and telephone networks)
- Equipment and installation of security-burglar signaling systems, video surveillance systems and access control.